Garnebo logoGARNEBOWork agreed in writing. One Garnebo contact
Service · Bologna and province

Light Demolition & Debris Removal in Bologna

We assess light demolition and material removal for the site conditions. The quote lists the requested work, how materials will be handled, timing and costs.

We reply within 48 hours; a complete quote follows when we have enough detail.

Illustrative image: bathroom demolition in progress

Illustrative image: bathroom demolition in progress

  • 48 hours

    Reply to your request

  • Agreed work

    Material handling in the quote

  • Protection

    Defined for the project

  • One contact

    One accountable contact runs the job

01 / What we remove

What we remove

We assess the requested work for the site conditions. The quote states what is included, including any transport and disposal. Light demolition only, without load-bearing structures.

  • Partition walls (drywall or hollow brick)
  • Wall tiles and ceramic flooring
  • Laminate, parquet or LVT flooring
  • Sanitary fittings, shower trays and bathtubs
  • Kitchens, fitted furniture and built-in wardrobes
  • Internal doors, frames and skirting
  • Plasterboard ceilings and bulkheads
  • Light screeds and substrates
  • Disconnected legacy plumbing and wiring
  • Wallpaper, carpet and adhesives
  • Any transport and disposal included in the quote
  • Any final clean included in the quote
02 / Where we stop

Where we stop

Light demolition only: we do not work on load-bearing walls, columns, slabs or beams. Structural work requires qualified professionals and contractors.

Yes, we do this

Light demolition of non-structural elements — partition walls, claddings, floors, sanitary fittings, fitted furniture.

No, we refer you

Load-bearing walls, columns, slabs, beams — these need a structural engineer and a specialised firm.

If suspect materials are found, work must stop and the situation be assessed by licensed professionals.
03 / The comparison

What the quote defines

FeatureGarneboTo check
Pricing
Written price for agreed work
Work and materials
Speed & Availability
We reply within 48 hours
Timing to be agreed
Waste Disposal
Handling stated in the quote
Transport and disposal if included
Communication
One accountable contact
Information needed for the request
04 / Illustrative examples

Illustrative example: Before & After

Illustrative images for comparison; they do not represent completed Garnebo projects.

Illustrative bathroom — Before & After

Illustrative image: bathroom before demolition
Illustrative image: bathroom during demolition
BeforeCleared
Illustrative image: bathroom during work.
In progress
Illustrative image: bathroom during work.
05 / The method

How we work

  1. 01

    Your request

    Send photos, measurements and a description. We let you know if more detail is needed.

  2. 02

    Assessment

    We review the requested work and site conditions.

  3. 03

    Site setup

    Any protection is defined in the quote for the project.

  4. 04

    Demolition & pickup

    The work and material handling are defined in the written quote.

  5. 05

    Agreed work

    Any cleaning and disposal are stated in the quote if included.

06 / Dust & protection

Dust & protection

The necessary protection depends on site conditions and is defined for the project.

  • 01Any protection of unaffected areas.
  • 02Any protection of transit floors.
  • 03Dust management measures to be defined for the work.
  • 04Materials and methods assessed for the site.
  • 05Any cleaning specified in the quote.
  • 06Any protection of common areas to be agreed.
Illustrative image: protection during work
Illustrative image: protection during work.
Illustrative image: corridor
Illustrative image: corridor.
07 / Waste & paperwork

Waste & paperwork

Handling of removed materials depends on the project and is specified in the quote.

CER 17 01 07CER 17 09 04FIRAlbo Gestori Ambientali
  • Materials to remove and site conditions.
  • Any transport, if included in the quote.
  • Any disposal, if included in the quote.
  • Handling arrangements defined for the project.
  • Costs stated in the written quote.
Illustrative image: documents
Illustrative image. Material handling is defined for the project.
09 / Timing & price

Timing & price

Timing to be agreed

  1. 01We reply within 48 hours.
  2. 02A complete quote follows when we have enough detail.
  3. 03Timing and availability are assessed for the project.

How the price is built

The written quote specifies the costs and agreed work.

Labour

Requested work.

01

Transport and disposal

If included in the quote.

02

Protection and consumables

If included in the quote.

03

Changes are described and approved in writing before work begins.

10 / FAQ

Frequently asked questions

01Can I stay in the apartment during the work?
This depends on site conditions and the agreed work.
02What if you find asbestos or hazardous materials?
If suspect materials are found, work must stop and the situation be assessed by licensed professionals.
03How do you handle the condominio communication?
Access arrangements and any building requirements must be defined for the project.
04How is the work defined?
The written quote states the agreed work, timing and price.
05Do you work on Saturdays?
Availability and working hours are agreed for the project.
06Can the price change at the end of the job?
Changes are described and approved in writing before work begins.
07Can I dispose of the debris myself?
Handling and any disposal of removed materials are defined in the quote.
08How soon can you start?
The start depends on availability and project conditions and is agreed for the project.

Start here

Send us photos. We reply within 48 hours.

Send photos and a description of the work. We will let you know if more information is needed for the quote.

  • We reply directly, not AI or call centre.
  • No newsletter, no third-party reseller.
  • We let you know if more information is needed.
Chat with us on WhatsApp+39 351 744 3151
Get a Flat-Rate Quote

We use cookies to analyze site traffic and measure the performance of our advertising campaigns.