Garnebo logoGARNEBOWork agreed in writing. One Garnebo contact
Service · Bologna and province

Drywall & Partition Walls

We assess drywall work for your space. Finish level, any insulation, timing and price are defined for the requested work and site conditions.

No obligation. We reply directly, not a call centre.

  • 48 hours

    Reply time

  • Finish level

    Agreed for the project

  • Insulation

    Specified when included

  • One contact

    One accountable contact

01 / What we build

What we build

We assess non-structural partitions, ceilings and linings for the requested space. Finish level and any insulation are specified in the written quote; no acoustic result is promised.

  • Partition walls — single and double layer
  • False ceilings (controsoffitti ribassati)
  • Contropareti and wall niches
  • Walk-in closets and room dividers
  • Any acoustic insulation specified for the project
  • Any thermal insulation specified for the project
  • Finish level agreed for the work
  • Access panels, corner bead and tape
02 / SCOPE & COORDINATION

Partitions, Ceilings & Integrated Lighting or Wiring

Partition walls and false ceilings often include spotlights, switches, or concealed pipes. We build the drywall structure and arrange qualified electricians or plumbers for the wiring and pipework—or coordinate directly with your technician before closing the boards.

Partitions, Ceilings & Linings

Non-structural partitions, false ceilings, wall linings, niches, acoustic/thermal insulation, and joint finishing up to Q4, all specified in your written quote.

Electrical, Plumbing & Structural Boundaries

New sockets, LED lighting circuits, and pipe routing inside walls are handled with qualified specialists (ours or yours) and certified at handover. Load-bearing structural work is excluded.

03 / Quote details

What the written quote will define

Quote fieldDetails for this project
ScopeRequested work, finish level and any preparation included.
MaterialsSelected materials, supply responsibility and any insulation.
TimingSchedule based on the agreed scope, site conditions and availability.
PriceFixed price for the agreed scope, with stated inclusions and exclusions.
VariationsChanges are explained and approved in writing before work begins.
05 / The method

How we work

  1. 01

    Site survey and quote

    We review the requested work and site conditions. When we have enough detail, we prepare a written fixed-price quote for the agreed scope.

  2. 02

    Material order and delivery

    The quote lists the selected materials, supply responsibility and any insulation included.

  3. 03

    Metal frame assembly

    We follow the agreed construction details and coordinate the sequence with our trusted licensed electrical/plumbing specialists or your own technician when plant work is needed.

  4. 04

    Plasterboard installation and jointing

    Installation and finishing follow the agreed scope. Protection and disposal are included only when stated in the quote.

  5. 05

    Agreed finish and handover

    The agreed finish level and any handover arrangements are specified in writing.

06 / Finish levels

Finish Levels Explained

Finish levels describe different preparation requirements. The selected level is agreed for each project and stated in the quote.

Q2 — Base finish

Joints taped, fasteners covered. Visible tape lines under side lighting. Acceptable for rough areas, garages, behind tiles.

Q3 — Standard finish

Light skim coat over joints and fasteners. Medium-quality for rental properties where wall lighting is indirect.

Q4 — Full-surface finish

A full-surface skim coat. Whether Q4 is suitable or included depends on the requested finish and is stated in the quote.

07 / Soundproofing

Soundproofing and Insulation

Insulation and wall construction can be assessed as part of a project. Acoustic outcomes depend on the full assembly and site conditions and are not guaranteed.

  • 01Requested board type and layer count
  • 02Any insulation specified in the quote
  • 03Joints and perimeter details included in the scope
  • 04Any thermal or vapour-control requirements assessed for the site
08 / Where we work

Where we work

We assess location and availability for each request. Any travel or access costs are stated in the written quote.

  • Bologna
  • Casalecchio di Reno
  • San Lazzaro di Savena
  • Imola
  • Valsamoggia
09 / Timing and price

Timing and price

Timing and price

  1. 01We reply within 48 hours.
  2. 02A written fixed-price quote follows when we have enough detail to define the scope.
  3. 03Start date and duration depend on the agreed work, site conditions and availability.

How the price is built

Minimum project value: €700 excluding VAT. The written quote sets out the costs for the agreed work:

Labour

Work included in the agreed scope.

01

Materials

Materials and supply responsibility stated in the quote, including any insulation specified.

02

Disposal

Any removal or disposal included in the quote.

03

Any variation is described and approved in writing before work begins.

10 / FAQ

Frequently asked questions

01Can you hang heavy cabinets or TVs on drywall walls?
Possibly, depending on the wall design, load and fixing method. Any reinforcement needs are assessed and specified for the project.
02Will a drywall partition really reduce noise in my Bologna condo?
Acoustic performance depends on the complete assembly and site conditions. We can assess construction options, but cannot promise a specific sound reduction without project-specific design and evidence.
03What affects the timing of drywall work?
Duration depends on the requested work, site conditions, materials and availability. We state an estimated schedule in the written quote.
04Can Garnebo combine drywall and tile work in the same renovation?
We assess combined scopes case by case and state any included work and responsibilities in writing.
05What is Q4 finish and why does it matter?
Q4 describes a full-surface skim coat. Whether it is appropriate or included depends on the requested finish and is stated in the quote.
06What's the difference between a controparete and a true partition?
A wall lining (controparete) is built against an existing wall; a partition stands between areas to create a separate room. Tell us which result you need, and we can assess the layout and construction requested.
07Can drywall work be done while I'm living in the apartment?
This depends on the work area, access and site conditions. We assess protection and logistics for the project and state any included measures in the quote.
08Is there a minimum job size for drywall projects?
The minimum project value is €700 excluding VAT. The quote states the price for the work you request; the minimum is not a typical service price.

Start here

Tell us about your drywall project

We reply within 48 hours. If we have enough detail, we prepare a written fixed-price quote for the agreed work; otherwise we explain what is needed next.

Chat with us on WhatsApp+39 351 744 3151
Get a Flat-Rate Quote

We use cookies to analyze site traffic and measure the performance of our advertising campaigns.