Drywall & Partition Walls
We assess drywall work for your space. Finish level, any insulation, timing and price are defined for the requested work and site conditions.
No obligation. We reply directly, not a call centre.
48 hours
Reply time
Finish level
Agreed for the project
Insulation
Specified when included
One contact
One accountable contact
What we build
We assess non-structural partitions, ceilings and linings for the requested space. Finish level and any insulation are specified in the written quote; no acoustic result is promised.
- Partition walls — single and double layer
- False ceilings (controsoffitti ribassati)
- Contropareti and wall niches
- Walk-in closets and room dividers
- Any acoustic insulation specified for the project
- Any thermal insulation specified for the project
- Finish level agreed for the work
- Access panels, corner bead and tape
Partitions, Ceilings & Integrated Lighting or Wiring
Partition walls and false ceilings often include spotlights, switches, or concealed pipes. We build the drywall structure and arrange qualified electricians or plumbers for the wiring and pipework—or coordinate directly with your technician before closing the boards.
Non-structural partitions, false ceilings, wall linings, niches, acoustic/thermal insulation, and joint finishing up to Q4, all specified in your written quote.
New sockets, LED lighting circuits, and pipe routing inside walls are handled with qualified specialists (ours or yours) and certified at handover. Load-bearing structural work is excluded.
What the written quote will define
| Quote field | Details for this project |
|---|---|
| Scope | Requested work, finish level and any preparation included. |
| Materials | Selected materials, supply responsibility and any insulation. |
| Timing | Schedule based on the agreed scope, site conditions and availability. |
| Price | Fixed price for the agreed scope, with stated inclusions and exclusions. |
| Variations | Changes are explained and approved in writing before work begins. |
How we work
- 01
Site survey and quote
We review the requested work and site conditions. When we have enough detail, we prepare a written fixed-price quote for the agreed scope.
- 02
Material order and delivery
The quote lists the selected materials, supply responsibility and any insulation included.
- 03
Metal frame assembly
We follow the agreed construction details and coordinate the sequence with our trusted licensed electrical/plumbing specialists or your own technician when plant work is needed.
- 04
Plasterboard installation and jointing
Installation and finishing follow the agreed scope. Protection and disposal are included only when stated in the quote.
- 05
Agreed finish and handover
The agreed finish level and any handover arrangements are specified in writing.
Finish Levels Explained
Finish levels describe different preparation requirements. The selected level is agreed for each project and stated in the quote.
Q2 — Base finish
Joints taped, fasteners covered. Visible tape lines under side lighting. Acceptable for rough areas, garages, behind tiles.
Q3 — Standard finish
Light skim coat over joints and fasteners. Medium-quality for rental properties where wall lighting is indirect.
Q4 — Full-surface finish
A full-surface skim coat. Whether Q4 is suitable or included depends on the requested finish and is stated in the quote.
Soundproofing and Insulation
Insulation and wall construction can be assessed as part of a project. Acoustic outcomes depend on the full assembly and site conditions and are not guaranteed.
- 01Requested board type and layer count
- 02Any insulation specified in the quote
- 03Joints and perimeter details included in the scope
- 04Any thermal or vapour-control requirements assessed for the site
Where we work
We assess location and availability for each request. Any travel or access costs are stated in the written quote.
- Bologna
- Casalecchio di Reno
- San Lazzaro di Savena
- Imola
- Valsamoggia
Timing and price
Timing and price
- 01We reply within 48 hours.
- 02A written fixed-price quote follows when we have enough detail to define the scope.
- 03Start date and duration depend on the agreed work, site conditions and availability.
How the price is built
Minimum project value: €700 excluding VAT. The written quote sets out the costs for the agreed work:
Labour
Work included in the agreed scope.
Materials
Materials and supply responsibility stated in the quote, including any insulation specified.
Disposal
Any removal or disposal included in the quote.
Any variation is described and approved in writing before work begins.
Frequently asked questions
01Can you hang heavy cabinets or TVs on drywall walls?
02Will a drywall partition really reduce noise in my Bologna condo?
03What affects the timing of drywall work?
04Can Garnebo combine drywall and tile work in the same renovation?
05What is Q4 finish and why does it matter?
06What's the difference between a controparete and a true partition?
07Can drywall work be done while I'm living in the apartment?
08Is there a minimum job size for drywall projects?
Start here
Tell us about your drywall project
We reply within 48 hours. If we have enough detail, we prepare a written fixed-price quote for the agreed work; otherwise we explain what is needed next.