Garnebo logoGARNEBOWork agreed in writing. One Garnebo contact
Service · Bologna and province

Ceramic Tile and Porcelain Stoneware Installation in Bologna

Professional porcelain stoneware, ceramic tile, and large-format installation in Bologna. Fixed-price itemized quote, agreed schedule, and high-precision finishing.

No obligation. We reply directly, not a call centre.

  • 48 hours

    Reply time

  • Quote defines

    Inclusions and materials

  • Timing

    Agreed for each project

  • One contact

    One accountable contact

01 / What we tile

What we tile

We install ceramic and gres tiles on walls and floors. We assess the existing surface and list any preparation or waterproofing needed in the quote; waterproofing is included only when specified.

  • Bathroom walls and floors — ceramic and gres porcellanato
  • Kitchen splashbacks and flooring
  • Living area and hallway flooring
  • Outdoor terraces and balcony tiling
  • Any substrate preparation assessed for the project
  • Waterproofing only when assessed and listed in the quote
  • Grouting, sealing and expansion joints
  • Skirting, step treads and threshold integration
02 / METROLOGICAL RIGOR · PROOF OVER STOCK

Technical Installation Specifications & UNI 11493 Standard

While client-consented job site photography is being prepared for publication, here are the technical construction standards we apply to every square meter.

METROLOGY · TOLERANCE < 2MM

Substrate inspection and millimeter flatness

Before installation we sound-test the screed to detect voids or cracks and check flatness with a 2-meter straightedge: deviations above 2 mm are corrected with cementitious skim coats or self-leveling compounds. We verify residual moisture (<2.0% CM on traditional screeds, <0.5% with underfloor heating).

Max deviation: 2 mm / 2 m · Max moisture: 2.0% CM

ADHESIVES · UNI 11493 STANDARD

Certified C2TE S1/S2 adhesives for porcelain stoneware

Modern porcelain stoneware has near-zero water absorption (<0.5%), making traditional mortars ineffective. We use only high-bond deformable polymer adhesives (class C2TE S1 or S2), applied with the back-buttering (double-spreading) technique on large formats to achieve full adhesive bed coverage and prevent hollow spots.

Adhesive coverage: 100% · Deformability: S1 / S2

JOINTS · CONTINUOUS EXPANSION

Calibrated grout joints and perimeter expansion joints

The standard prohibits butt-jointed (zero-gap) installation, the primary cause of tile tenting and lifting. We set minimum 2 mm joints using self-leveling wedge spacers and install elastic silicone expansion joints along all perimeters and every 20–25 sqm to absorb structural thermal movement.

Min joint width: 2.0 mm · Expansion bay: every 20–25 sqm

PROTECTION · HYDRAULIC SEAL

Continuous elastic membrane for showers and wet zones

In wet areas assessed for waterproofing (shower trays, basin walls), we apply a two-component elastic liquid waterproofing membrane reinforced with fiberglass mesh and corner sealing tapes, protecting underlying apartments and adjacent walls from water ingress.

Dry film thickness: ≥ 2.0 mm · Reinforcing mesh

02 / COMPLETE COORDINATION

Tiling, Plumbing & Electrical: How We Coordinate Your Project

You don't need to juggle multiple trades. Alongside all tile and substrate work, we arrange and coordinate qualified plumbers and electricians whenever your project requires moving pipes, drains, or wiring—or we work seamlessly with your own technicians.

Tiling, Substrates & Waterproofing

Old tile removal, debris haulage, screed repairs and self-leveling compounds, liquid shower waterproofing, porcelain stoneware, ceramic, large-format and skirting installation, grouting, and final acid-buffered cleaning.

Plumbing & Electrical Modifications

Moving drains, water supply lines, concealed shower mixers, or electrical points: we bring in and schedule qualified specialists who certify the installation at handover, so tiling and plant work stay on one timeline.

Note on structural work & hazardous materials: We do not alter load-bearing structures. If the pre-job inspection uncovers suspect asbestos adhesives, work pauses so an authorized remediation firm can clear the site safely.
03 / Quote details

What the written quote will define

Quote fieldDetails for this project
ScopeSurfaces, preparation and installation included in the agreed work.
MaterialsSelected materials, supply responsibility and finish details.
WaterproofingAny waterproofing or substrate work assessed and included.
TimingSchedule based on the scope, site conditions and material availability.
Price and changesFixed price for the agreed scope; variations require written approval first.
05 / The method

How we work

  1. 01

    Site survey and quote

    We review the space and requested work. When we have enough detail, we prepare a written fixed-price quote for the agreed scope.

  2. 02

    Material selection

    The quote identifies selected materials, supply responsibility and finish details.

  3. 03

    Substrate and waterproofing

    Any removal, substrate preparation or waterproofing is included only when assessed and listed in the quote.

  4. 04

    Tile installation

    Work follows the agreed layout and scope. Updates are arranged for the specific project.

  5. 05

    Handover

    The written scope defines finishing details and any handover arrangements.

05 / PRELIMINARY ASSESSMENT

Demolition or Tile-Over-Tile Overlay?

How to evaluate whether new tiles can be installed over the existing floor or if full removal is required.

Site ConditionRecommended ApproachKey Factors & Trade-Offs
Stable existing floor, compatible door clearancesTile-Over-Tile OverlayNo rubble disposal costs and shorter turnaround (no screed curing wait). Requires deep acid degreasing and an epoxy bonding primer.
Hollow existing tiles, constrained door heights, or dampnessDemolition & New ScreedPermanently resolves substrate defects, restores millimeter flatness, and allows installation of underfloor heating or acoustic mats.
Full bathroom remodel with fixture relocationFull Strip-Out to SlabRequired so a qualified plumber can route new pipework before a fresh screed is laid to the correct falls.
06 / Materials & quality

Materials & Quality

Materials and supply arrangements are assessed for each project and listed in the written quote.

  • 01Selected tile type and finish
  • 02Material supply responsibility
  • 03Availability and delivery timing
  • 04Any project-specific requirements
07 / Where we work

Where we work

We assess location and availability for each request. Any travel or access costs are stated in the written quote.

08 / Timing & price

Timing & price

The price depends on the surfaces, substrate condition, materials and agreed work.

Timing and price

  1. 01We reply within 48 hours.
  2. 02A written fixed-price quote follows when we have enough detail to define the scope.
  3. 03Start date and duration depend on the agreed work, site conditions and availability.

How the price is built

Minimum project value: €700 excluding VAT. The written quote sets out the costs for the agreed work:

Labour

Work and surface preparation listed in the quote.

01

Materials

Chosen tile and grout, plus who supplies them.

02

Disposal

Any removal or disposal included in the quote.

03

Any variation is described and approved in writing before work begins.

09 / FAQ

Frequently asked questions

01Is gres really better than ceramic for my Bologna bathroom?
Ceramic and gres have different properties. We can discuss the options for your space; material selection and supply responsibility are stated in the quote.
02How long before I can use a newly tiled shower?
The time before use depends on the materials, manufacturer instructions and site conditions. We provide the relevant guidance for the specific work.
03Can you also handle plumbing and radiators when renovating my bathroom?
Yes. When your bathroom or kitchen project requires moving drains, pipes, radiators, or electrical points, we arrange qualified plumbers and electricians and coordinate their schedule with our tiling work—or collaborate with your own technician.
04What happens if the scope changes?
We explain the proposed change and any effect on price or timing, then request written approval before proceeding.
05Do you supply tiles or do I buy them?
Supply arrangements depend on the project. The written quote states who supplies the tiles and any related costs.
06What happens if old adhesive contains asbestos?
Work is paused while the situation is assessed. Any further steps and related costs are agreed before work resumes.
07Do you tile outdoors in Bologna winters?
Outdoor work depends on site conditions, materials and weather. Requirements are assessed and stated in the quote.
08Can I stay in the apartment during tile work?
Possible for larger apartments where the work area can be isolated. We decide at the walk-through and include site logistics in the quote.
09What affects the start date and duration?
We confirm a possible start date after reviewing the scope, material availability and current schedule.
10What areas of Bologna do you cover for tile work?
We confirm availability for your location after reviewing the project details. Any travel costs are stated in the written quote.
Guide to Replacing Damaged Bathroom Tiles in Bologna

Start here

Tell us about your tile project

We reply within 48 hours. If we have enough detail, we prepare a written fixed-price quote for the agreed work; otherwise we explain what is needed next.

Send 3 photos via WhatsApp (wide room view, door/threshold heights, and current substrate) for an initial assessment within 48 hours.

Chat with us on WhatsApp+39 351 744 3151
Get a Flat-Rate Quote

We use cookies to analyze site traffic and measure the performance of our advertising campaigns.